Value before the MES link? Yes. Location and time come first.
What location proves on its own, and when the MES connection should follow.
Yes, you can prove the value of RTLS before a live MES connection. Search time, how long carriers wait in each zone and where work piles up all come from location and time alone. With AmIMotion, a first bay can start with AmIGo tags on one flow's trolleys, located down to ±10 cm in 3D, depending on the site, and AmIHub timing every zone. Link each trolley to its job in AmIHub before you report any result per job. The MES connection can follow when the pilot earns it.Updated
What location shows on its own
- Where each tagged trolley, bin or tool is, and when it was last seen.
- Time in each zone, by shift and station.
- How often people search, and how long finding something takes.
AmIHub gives the first two from AmIGo tags and AmIMo anchors, with no MES connection. Your team counts the third, before and after.
What needs the job link
Which job waits where, and lead times per job, need the carrier-to-job link. Start by linking trolleys to jobs in AmIHub, then connect the MES when the pilot earns it. AmIHub offers REST, MQTT, WebSocket and an omlox hub interface for that step, and connectors are confirmed for each site.
A pilot plan that works
- Measure search time and walks before any tag goes on.
- Tag one flow's carriers and agree a few zones.
- Link part of the pilot's trolleys to their jobs in AmIHub.
- Compare, then decide on the MES connection.
Who to involve, and when
IT is needed from day one, for the network and where AmIHub runs. The MES owner joins when the link is planned. Production and the people who search for work own the baseline. Bring all three to the AmIMotion scoping call.
Common follow-ups.
Can we prove the value of RTLS without a live MES connection?
Yes. Location and time alone show search time, waits and dwell. Link trolleys to jobs in AmIHub during the pilot, and connect the MES later.
What does the MES link add?
Which job is on each carrier, so waits become waits per job.
Do we need IT involved from day one?
For the network and where AmIHub runs, yes. The MES connector can come later.
Read next.
Questions about your own floor?An engineer answers them on a short call, with the live map open.Book a call