Dwell time is the time a tagged carrier spends inside an agreed zone, from the moment it enters to the moment it leaves. A real-time location system measures it by time-stamping every zone entry and exit. AmIMotion does this in AmIHub, with AmIGo tags located down to ±10 cm in 3D, depending on the site, so neighbouring queues and stations can be told apart. You see how long each carrier has waited while it is still waiting.Updated

Low view of a loaded trolley rolling across a yellow zone line on a plant floor
One trolley's morning on a timeline: its stops in four zones, the two waits in amber, timed from zone entry to zone exit.PressInspection queueInspectionDock lane07:0009:0011:0013:0008:1509:57entryexit102 minShift109 minnow

Start with the zones

A zone is an agreed area of the floor, such as an inspection queue or a dock lane. Draw zones around the process, not around radio coverage. In AmIHub you name the zones yourself. Neighbouring zones need positions precise enough to tell them apart, which is why UWB is used where queues sit side by side.

Entry, exit and the edge

Every time a tag crosses a zone boundary, AmIHub records a time. Agree what counts as a visit: a short pass through a zone on the way somewhere else should not count as waiting. A trolley parked across a boundary is the hard case. Agree a rule for it before the pilot, and ask any supplier, AmIMotion included, to show how its system handles that case.

A trolley enters the inspection queue zone at 09:12 and leaves at 10:47. Dwell is 1 h 35 min.INSPECTION QUEUEENTRYEXIT09:40
Entry
09:12
Exit
still inside
Waiting now
28 min

What dwell includes

Dwell is not cycle time. Dwell includes waiting, processing, breaks and anything else that happens while the carrier sits in the zone. To separate waiting from working you need another signal, such as a start or finish event from your MES, or a scan. AmIHub can take those events from your own systems.

Waits that cross a shift

A wait can start on one shift and end on the next. Before an AmIMotion pilot starts, we agree how to count a wait that runs past shift end, so every report reads the same way.

Using it well

  • Name who on your team acts when work waits too long.
  • Compare dwell by shift, product and station, not just averages.
  • Treat a long dwell as a reason to look, not as a diagnosis.

How AmIMotion does it

AmIHub time-stamps every enter, exit, idle and dwell event and keeps the history, so you can ask for time in zone by shift, station or time window. AmIHub also sends each entry and exit to any system you name, as it happens, over MQTT, REST or WebSocket. Why work waited is for your team to say.

Common follow-ups.

How can I see where work in progress is waiting?

Tag the carriers, name the zones where work queues, and time every entry and exit. AmIHub shows how long each tagged carrier has waited in each zone.

Is dwell time the same as cycle time?

No. Dwell is time in a zone and includes waiting and processing. Cycle time needs process start and finish events, which AmIHub can take from your MES.

Do we need an MES to measure dwell?

No. Dwell comes from location and time alone. The MES link adds which job was waiting.

How is a wait that runs past shift end counted?

AmIMotion agrees the rule with your team before the pilot starts, so every report counts it the same way.

Questions about your own floor?An engineer answers them on a short call, with the live map open.Book a call